Showers & tubs

How Much Does a Tub-to-Shower Conversion Cost in Sacramento? (2027)

A tub-to-shower conversion in the Sacramento area costs $15,000 to $32,000, all-in. See what each price level buys, and how it differs from a one-day conversion.

Yevgeniy Shestopal · Chief Executive Officer, Western RenovationsPublished 5 min read

Walk-in shower built where a bathtub used to be, with a frameless glass panel, recessed niche and teak fold-down seat

Key takeaways

  • A tub-to-shower conversion in the Sacramento and Roseville area costs $15,000 to $32,000, all-in.
  • A prefab panel shower costs $15,000 to $22,000. A tiled shower with glass costs $18,000 to $27,000. A custom curbless tile shower costs $25,000 to $32,000.
  • A one-day conversion is a different product. It is priced lower because the plumbing and the walls behind the tub are usually left as they are.
  • Most of our conversions take 2 to 4 weeks of work in your home, through the final inspection. Design, ordering and the permit come first.

What does a tub-to-shower conversion cost?

A tub-to-shower conversion in the Sacramento and Roseville area costs $15,000 to $32,000. That is for a walk-in shower built in the same space as the tub.

The price is all-in. It covers taking out the tub, updating the drain and valve, waterproofing, the shower walls and floor, glass, fixtures, and the permit and inspections.

Type of showerPrice rangeWhat you get
Prefab walk-in shower (Essential)$15,000 – $22,000Tub out, factory shower base, solid-surface or acrylic wall panels, glass panel, standard valve and showerhead
Tiled walk-in shower with glass (Signature)$18,000 – $27,000Porcelain tile walls, built-in niche, low curb, frameless or semi-frameless glass, upgraded fixtures
Custom curbless tile shower (Luxe)$25,000 – $32,000Level-entry floor, frameless glass, bench and niches, rain head, premium tile

Ranges are a guide, not a quote. Your exact price comes after a free in-home visit. Prices last reviewed November 2026.

What each price buys

$15,000 to $22,000: a prefab walk-in shower

The tub comes all the way out. We update the drain and the valve, check and repair the subfloor, and install a factory-made shower base with large solid-surface or acrylic wall panels.

Walk-in shower with smooth white wall panels, a low-threshold base and a single clear glass panel

There are few seams and no grout to scrub. Acrylic is a good material when it goes over sound framing and a properly sized drain. It is the lowest price for a new shower that is rebuilt from the framing out.

$18,000 to $27,000: a tiled shower with glass

This is the most popular choice. The walls are porcelain tile over a full waterproof layer, with a recessed niche for bottles and a frameless or semi-frameless glass panel or door.

You choose the tile, the layout and the fixtures, so it looks custom. Tile takes longer to install than panels, and the glass is measured after the tile is set.

$25,000 to $32,000: a custom curbless tile shower

There is no curb at all. The bathroom floor runs straight into the shower. We lower and slope the floor, waterproof it and add a bench, niches and frameless glass.

It costs the most because of the floor work. It is also the easiest shower to step or roll into, now and later. Our curbless shower page explains how it is built.

Why is a one-day tub-to-shower conversion cheaper?

Because it is a different product. If you have priced a one-day conversion, it helps to know what you are comparing.

A one-day conversion is built for speed. A crew fits a shower base and wall system into the tub space in a single visit. To finish in a day, the work behind the walls is usually kept to a minimum. Ask whether the drain is resized, whether the valve is replaced, and whether the old wall surface comes off or gets covered.

Our conversions are remodels. Every one of them, including the prefab option, starts by taking the alcove down to the framing. That is how we find and fix a soft subfloor, set a drain sized for a shower and waterproof every wall before anything new goes on. It is also why our timeline is weeks, not a day.

Neither one is wrong. They solve different problems at different prices. The difference is not the material, since we install acrylic too. It is what happens behind it. We do not offer one-day installs, and we do not fit liners over an old tub or old tile. Our work comes with a 2-year craftsmanship warranty.

Questions to ask about any quote, ours included:

  • Does the old tub and wall surface come all the way out?
  • Is the drain replaced and sized for a shower?
  • Is the shower valve replaced?
  • What waterproofing goes behind the walls and under the floor?
  • Is the permit included?
  • What warranty covers the workmanship?
  • What happens, and what does it cost, if you find damage?

What we find behind the old tub

You cannot see under a tub until it is out. Once it is, we check the subfloor, the framing and the plumbing before anything new goes in.

If we find damage, we show you, explain the options and put any change in writing for your approval before we do the work.

About half of our tub-to-shower conversions need some subfloor repair. Behind the walls, the usual finds are rotted wood, mold, plumbing that was installed wrong and plumbing that is outdated. None of it can be seen at the first visit, which is why we explain up front how repairs are priced.

What else moves the price

  • Moving the drain, the valve or a wall. Staying in the tub's footprint costs the least.
  • A window in the shower. It needs safety glass and a sill that sheds water, or it can be raised or closed.
  • Glass. A single fixed panel costs less than a frameless door.
  • Extras. A bench, more niches, a handheld shower on a slide bar or grab bars.

How long does a conversion take?

Most of our tub-to-shower conversions take 2 to 4 weeks from tear-out to final walkthrough. Tile and custom glass take longer than prefab panels. You get the schedule before work starts.

Tub-to-shower conversion in progress with a new shower pan and blue waterproofing membrane on the walls

Three showers we have built

  • Finished after a DIY demo. The homeowners tore out their old tub and shower themselves, then hired us to finish. We matched the floor to tile they had stored, tiled the walls, coordinated the plumbing and installed a glass walk-in shower with a recessed niche. See the project.
  • Penny-tile walk-in showers on a set budget. Marble-look wall tile, penny-tile floors, matte black fixtures and frameless glass, with the scope planned to fit the family's budget. See the project.
  • A curbless shower in Roseville. A level-entry shower with a built-in seat, a handheld showerhead and grab bars, built so the client's father could stay independent. See the project.

Get a range for your bathroom

Our tub-to-shower conversion cost calculator gives you an all-in range in about a minute. For the full service, see tub-to-shower conversions.

When you are ready, we will check your tub space, drain and walls and give you a written, itemized quote. Get a free estimate.

The Bottom Line

A tub-to-shower conversion in the Sacramento area costs $15,000 to $32,000. Prefab panels sit at the low end, tile with glass in the middle and a custom curbless shower at the top. A one-day conversion is a different product at a different price, so compare what happens behind the walls, not only the number.

Sources

  1. Western Renovations price list (reviewed November 2026) · Western Renovations

Frequently Asked Questions

Still have a question?

Talk to a real person on our team. We’re happy to help, even if you’re just starting to plan.

How much does a one-day tub-to-shower conversion cost?

We do not offer one-day conversions, so we cannot quote one. They are priced lower than a full conversion because the work is planned to finish in one visit. Before you compare prices, ask what happens to the drain, the valve and the walls behind the old tub.

Is tile or acrylic better for a shower?

Both work when the shower is built right. Acrylic and solid-surface panels cost less and have no grout to clean. Tile costs more and takes longer, but you choose the look and it can be built curbless. What matters most is the waterproofing behind either one.

Do I need a permit for a tub-to-shower conversion?

Usually, yes, because the plumbing changes. The permit office depends on your address. We take care of the permits and inspections your project needs.

Will removing my only bathtub hurt resale?

It can matter to buyers with young children. If it is the only tub in the home and you may sell soon, talk with your real estate agent first. Many families keep one tub and convert the other bathroom.

Do you offer financing?

Yes. We offer 0% financing for 12 months. On approved credit.

Related Services

More From the Blog

Primary bathroom with a navy double vanity and a freestanding tub

Ready to plan your bathroom?

Start with a free in-home visit. We’ll measure, listen and give you a written, itemized quote. No pressure.